Tuesday, July 10, 2007
Framers Day one
The framing began today. It looks like the got the sill ( the piece that goes on top of the foundation) completed and they framed out the floor for the mudroom. They did this part first because it has to be flush with the floor in the kitchen. So far so good. I guess they said that they were hoping to get more done tomorrow because it was so hot (about 90 F) today. Tomorrow looks like another hot one so we shall see. The kitchen designer from Jackson Lumber is coming tomorrow to measure for the cabinets. Once we have those measurements we will be able to move on plumbing, electrical, and the window in the kitchen.
Monday, July 09, 2007
Rained out (sort of)
Well, it rained today for about an hour and then was beautiful, but of course the framers didn't want to start in the rain so they went home before it stopped. They will be back to start tomorrow.
Thursday, July 05, 2007
They finished gutting the kitchen today and the exterior doors were framed. All that looks great. The doorway from the kitchen to the dining room also got framed and I think we have our first official problem. We had talked to the contractor about making the door a 45 degree even though the drawings were drawn as more of a 60 degree. They framed the door just like the drawings... so I'll have to talk to our contractor about making that change tomorrow. I also need to ask about the fact that the basement is now leaking near where the new foundation connects to the old foundation. It's actually near where the foundation crumbled a bit when they excavated for the foundation. OK, enough words...
Wednesday, July 04, 2007
Framing Materials Arrive
Monday, July 02, 2007
Kitchen Demo Started
Friday, June 29, 2007
Floor os poured
Thursday, June 28, 2007
Getting ready for the floor.
Back filled
This morning the guys came to back fill the foundation and poured crushed rocks for the concrete slab that will be coming tomorrow. It looks like the driveway will be slopped down toward the garage a bit, which I am concerned with. I talked to our contractor who said that we may end up with a built up driveway. That means that we'll need to fill the yard to make it all flat.


Friday, June 22, 2007
Foundation is finished.
The forms came off very early this morning and the foundation guys are gone. We can start to see what this thing is going to look like. The second picture is a shot of where the foundation had crumbled a bit, but they patched it up with some cement.

Thursday, June 21, 2007
The footings were poured yesterday and they took the footing molds off this morning. Then the foundation wall molds went up and they poured the concrete. The molds should come off tomorrow which means that they can back fill all this dirt and start on the garage floor. We noticed one place where the guy who did the excavation work hit our field stone foundation and it sort of crumbled. The foundation guys just poured concrete in there so we should be all set, but it didn't look so great - I wish I had taken a picture. From now on we will take pictures when we see something wrong. Anyway, here are the molds (that are filled with concrete).
Tuesday, June 19, 2007
A Hole in our Yard
Wednesday, June 13, 2007
The Driveway is mostly gone.
Excavating the driveway
Monday, June 11, 2007
Garage is gone!
Sunday, June 10, 2007
Garage knocked down.
I had the help of a neighbor yesterday to take down the roof and then we cut the sides down and then tipped the front and back over. We even cut up the front and part of one of the sides. Now all I have left to do it cut up the walls and throw them in the dumpster. It's not looking like I'm going to be able to fit the whole thing in this dumpster - I'll need to start doing some serious space management. 
Thursday, June 07, 2007
Digging planned for next week!
We found out today that our contractor has planned that the digging for the new foundation will start next week. I rethought our decision to wait to take down the garage and decided that we should take it down now before digging begins so we will be able to get to it. I have ordered a 20 yard dumpster to be delivered on Saturday morning. Here is a picture of the garage (sorry - it's the best I could find)
Wednesday, June 06, 2007
The Addition Is Coming
For a while we have been trying to figure out a way to add on to our house and we finally had a architect draw up some plans of what we were thinking of and got about five quotes from contractors. We picked one and have been waiting about a month for the town of Andover to issue a building permit. We had to get a special permit to build on to our house because it is Preexisting non-conforming.
At any rate things are starting to happen to our house now so I'm going to start blogging our progress on the addition. Actually it is more than an addition, it is a addition with a full kitchen remodel. Stay tuned for pictures.
At any rate things are starting to happen to our house now so I'm going to start blogging our progress on the addition. Actually it is more than an addition, it is a addition with a full kitchen remodel. Stay tuned for pictures.