The garage floor was poured today. It looks great and there is about a 3 inch difference in height from the front to the back. The dumpster was also delivered later in the day.
Friday, June 29, 2007
Subscribe to:
Post Comments (Atom)
What we are doing to our house now?
No comments:
Post a Comment