The toilet was finally finished this weekend. I ended up doing all the plumbing that we had already paid the plumber to do. It turns out that our plumber is sort of tough to schedule and I just didn't want to deal with him anymore.
I attached the cabinets to the wall too. It actually went pretty well. The tough part was that the drawers to the right are not as deep as the vanity so I had to attach them to the side wall and then attach the vanity to the back wall and then screw them together. We still need a kick board and a countertop to finish it off.
Here is the shower plumbing. We got a shower system with a diverter valve so the thing to the left will be a hand spray shower head. This is one of my favorite parts. I love soldering copper pipes!
Monday, April 05, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment