They finished gutting the kitchen today and the exterior doors were framed. All that looks great. The doorway from the kitchen to the dining room also got framed and I think we have our first official problem. We had talked to the contractor about making the door a 45 degree even though the drawings were drawn as more of a 60 degree. They framed the door just like the drawings... so I'll have to talk to our contractor about making that change tomorrow. I also need to ask about the fact that the basement is now leaking near where the new foundation connects to the old foundation. It's actually near where the foundation crumbled a bit when they excavated for the foundation. OK, enough words...