While wiring the addition I had to cut a small hole that I could crawl through to get from the original attic to the new attic.I don't think that the original attic soffit vents exist so this hole will hopefully help the original attic vent a bit better.
Here I am crawling from the old attic into the new one. Thanks to Ethan for taking this picture.
Here is a look at the new attic space with only one layer of insulation. More to come!
Thursday, September 10, 2009
Thursday, August 06, 2009
Adding the radiant loop
To continue with the plumbing work I needed to connect all the piping from the pex tubing, through another pump and into the heat exchanger.
OK, now we are rockin'. The loop for the pex tubing is installed. The thing with the tag on it is a mixing valve that mixes the cooler water returning from the loop with the hot water coming out of the heat exchanger and that water goes up tat diagonal pipe to heat the pex loop.
Here is the same angle but from a little farther away.
And another from a different angle. Maybe this stuff is boring to some people but how cool are all those pipes!
Sunday, August 02, 2009
Plumbing - Tieing into the boiler
Now this is cool stuff! To get hot water into the pex tubing first you have to get hot water from the boiler and force it through a heat exchanger. This heats up the heat exchanger and then there be another loop that feeds through the heat exchanger. First things first: Tapping into the boiler water is the tough part. While I'm working on that we won't have any heat or hot water....so I'll start after the kids go to bed and ... we'll see how long it takes me.
Here you can see the tee in the bottom left hand side of the picture. The red pump in the middle will pump water from left to right. The water will be pumped out of the boiler (on the right), through the tee, and up and through the red pump.
Here you can see the same red pump from a different angle. The water is pumped toward the camera and then into the heat exchanger on the right. It comes out the bottom and then back through the tee on the bottom left and back into the boiler. You can see the two ports on the heat exchanger that will be connected to the pex loop... that's next. Oh, and I finished at 1:30am
Monday, July 27, 2009
Aluminum
Once all the pieces of tubing have been pulled through the joist bays I needed to fasten the tubing to the ceiling. This is done with pieces of aluminum that have been precut and shaped specifically for this task.
These are the pieces of aluminum that I purchased from www.radiantec.com
This is a shot of the aluminum stapled to the first run of tubing.Each piece of aluminum has about 12 staples.
I like this shot - between the joists looking down one of the runs.
And here is a shot of the very necessary staple gun. I bought this one at home depot, but it turned out to not be powerfull enough. I brought it back and got the next size up. I don't think that going through aluminum is tough, but that plywood is tough stuff!
Monday, July 20, 2009
The Pex tubing needs to run up and down each joist bay. The kit I bought had two 300 foot pieces of tubing. I snaked the tubing through the joist bay at the furthest end of the garage and started working backward.
Here is the end of the tubing...the other end is out in the back yard. It was tough keeping the tubing from getting twisted while so much of it is laying in a big pile in the back yard.
Here is a close up of the first joist bay. One of the ends goes all the way back to the basement and the other end needs to go down and back each of the joist bays. Lot of fun!
Here is the tubing going down toward the basement.
And finally. The first section of tubing is finished. Now I will move on to the next section that goes under the bathroom.
Thursday, November 01, 2007
Batman and Spiderman on Holloween
The two superheroes set out on there way Halloween night to check on the neighborhood. After making sure everybody was safe the superheroes demanded candy from each homeowner. Batman felt that some of the offerings were unacceptable and refused them. Both had a wonderful night and the neighborhood survived.
Friday, October 05, 2007
Living large
Well, we finally can use our new kitchen. You can see in the pictures that we still have to paint the trim, but everything else is pretty much done. Our contractor is comming back on Monday to fix a handful of things we noticed, but overall we are very excited about the kitchen. It's such an amazing change from what we had. When we get the trim painted I'll post before and after pictures.... wait for it!
Tuesday, September 25, 2007
Drawers
Ok, so I know this is silly so you don't even need to tell me, but I thought it was pretty cool how these drawers close slowly even when you slam them... check it out.
Yard wark starts
John Gaunt, our neighbor, has started fixing up the back yard. We asked him to fill in the old driveway and smooth out the rest of the back yard. Hopefully we still have enough time to plant grass this year. Below you can see the microwave got installed and the plumber hooked up the faucet so we are almost fully functional!
There is one thing that has been stressing us out though. Ever since they took the plastic down in between the dining room and kitchen we noticed a big bump in the wall. Our contractor is trying to figure out what to do about it and it may involve tearing down the existing plaster! Just when we thought we were almost done with all the cleanup work!
Sunday, September 23, 2007
Family Hike
Saturday, September 22, 2007
Appliances and a new view!
Friday, September 21, 2007
Trim around door and bottom of one cabinet
Thursday, September 20, 2007
Kitchen window is trimmed and lights!
Wednesday, September 19, 2007
Tuesday, September 18, 2007
Subscribe to:
Posts (Atom)