Tuesday, August 14, 2007

Framers are back

The framing guys are back to fix up some things that the GC flagged and some things that the framing inspector flagged.
1) Box in second floor drain.
2) Install interior doors
3) Fill in gaps around doors and house.
4) Nail the double LVL beam from both sides (not just one)
5) Install fire blocking at the top of most first floor walls.
6) Install the new beam and double joists in kitchen ceiling.
7) Build a wall in attic space to install blue board on.

They arrived yesterday and started a bunch of these tasks and also napped next to the sandbox for a while. Later the kids had fun in the huge puddle in front of our house with the builders lunch trash.

We also found out that the cabinets would arrive the week of September 3rd. ARG!

No comments: