Things have slowed down a bit this week. The exterior is almost finished as you can see. They have been doing some work on the second floor entry to the addition and lolly collumns in the basement. Other than that we hope that all the supplies are here to finish up all the little jobs they have to finish.
Tuesday, July 31, 2007
Friday, July 27, 2007
Second story connected.
Kitchen window installed
External view with all windows.
Thursday, July 26, 2007
No pictures today.
I left my camera at work today so I don't have any pictures for you, but nothing much happened that you can see anyway. They finished roofing most of the addition, finished siding the East wall of the addition (that's the gable end - the only one with all the windows in it), and the electrician came back to wire the addition. They should ahve the front window in tomorrow and the wiring finished...I hope. I don't think this old refrigerator can handle being shut off again.
Wednesday, July 25, 2007
Tuesday, July 24, 2007
Siding started.
Kitchen plans
Monday, July 23, 2007
Electricity Arrives
Kathleen and I had a busy morning - we met with the electrician at 7:30am to figure out where all the outlets, lights, and switches are going. Then we went over to Fitzgerald Tile in Woburn, MA and picked out three tile samples for the kitchen floor. The guys were busy today as well; The rear door in the kitchen looks like it is in and looks very good. The window frame looks better also. The shingles are going on the roof (in the back) and the mudroom is now all framed. Looks like rough framing is finished so it's time to cut another check to the G.C.
Saturday, July 21, 2007
Kitchen Window Frame
Friday, July 20, 2007
Cabinets have been Finalized.
The kitchen cabinets have been finalized and we have the plans. Kathleen came back form Maine with the kids yesterday for a couple days and last night we went up to check out the new space. It’s looking good, but a bit small – Oh Well. We have to figure where all the outlets and switches and that type of thing are going to go so the electrician can do that on MONDAY! Oh, ya, the roof is supposed to go on Monday also! They are cutting out the hole for the kitchen window right now. I’ll have pictures tonight when they are done.
Wednesday, July 18, 2007
New View
The Roof Takes Shape
Well with all the rain we were supposed to have today I think it lit a fire under Mike's butt. He got here this morning with one extra guy and they got right to work with the ridge of the roof so they could put up a tarp to cover everything in case it rained. I left for work feeling sure that they would leave early, but it turns out that they got a lot done. The ridge is up and they have framed and plywooded all the walls on the second story. Tomorrow we should see the dormer go in and the plywood go on the roof.
Tuesday, July 17, 2007
Fun in the Sun
Up and up!
I arrived home tonight to find the East wall finished and the 3ft knee wall in the front also finished. But wait... somethings wrong, isn't there supposed to be a window in the front wall? I looked at the plans and it is clear from the plans that the window will be lower than 3 feet. Hmmmm, just one more thing to worry about. I'm beginning to see why this is so stressful - too much to think about! Well, off to walk the dog.
No work on Monday
So, now that I have a small audience I'll need to spice this up a bit...hmmmm. Well no work was done on the house so there's not much to talk about on that front. But I did take Indy for a walk - ooooo exciting!. My neighbors (Steve and Holly) came over to check out the kitchen (or lack of one). Steve said that I should be running pipes up to the bedrooms for heat while the walls and ceiling are open. I hadn't thought about that, but I don't see it happening. Also I was invited down to the Main Line Creamery for ice cream last night with the girls from down the street (oh, and Mark too). That was the highlight of my day.
This morning Mike said that they would be starting on the roof today. That will be cool to see, but all I care about is getting this darned kitchen cabinet design finished and ordered.
This morning Mike said that they would be starting on the roof today. That will be cool to see, but all I care about is getting this darned kitchen cabinet design finished and ordered.
Friday, July 13, 2007
Secondy Story Floor Framed
The second story floor went up today as you can see below. We also got the three exterior doors and the transom window that will go above the garage door today. Mike mentioned that the door from the mudroom to the garage may either need to be smaller than normal or we may need to make the closet smaller. I don't like either idea, but I think making the closet smaller would be better.
Thursday, July 12, 2007
First floor framing finished up
Wednesday, July 11, 2007
First floor framed
Mike started on the walls this morning and ended up getting most of the first floor finished. The ceilings in the garage are going to be very high - perfect. There was a question as to how high to put the windows, but I think they are going to pretty much go in the middle of the wall (as far from the floor as they are from the ceiling). Jessica from Jackson Lumbar also came this morning to measure for the cabinets. We should have the final plans on Friday and get the cabinets ordered by Monday.